PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued layout block at the Detention Cells (1st Floor) Facing East.jpg Installed a steel post at the 4th floor North Elevation.jpg Installed steel post and clips at the East Elevation.jpg Installing ductwork fitters at the 2nd floor Facing East.jpg Installing ductwork hangers at the 3rd floor Facing North.jpg Installing Roof Drains and Overflow roof drains at the lower roof Facing East.jpg Installing the parapet around the perimeter of the top roof at the North Elevation.jpg Laying out block at the detention cells 1st floor Facing North-East.jpg Stair -3 Delivery (2nd floor) Facing North.jpg
Previous pageNext page Installing ductwork hangers at the 3rd floor Facing North
Installing ductwork hangers at the 3rd floor Facing North